# Six Quality Checks Before Your Monument Order Ships

> Define order-specific granite monument inspection checks, approved drawing revisions, material evidence and release decisions before shipment from China.

Source: [Six Quality Checks Before Your Monument Order Ships](https://www.cnmonuments.com/buyer-guides/granite-monument-quality-control/)

Language: en

[Back to Buyer Guides](https://www.cnmonuments.com/buyer-guides/) 

Buying Guide   Featured

Before shipping, check the stone, sizes, finish, lettering, fit and packing against what you approved.

July 29, 2026Updated 2026-11-20·5 min read·Boda Stone

## Short answer

Quality control should begin with the approved purchase order and CAD drawing, then follow the monument through material selection, cutting, finishing, decoration, assembly and packing. A final photograph cannot prove every earlier step.

If you cannot visit the factory, ask for measurements beside the drawing, clear photos of the finish and a check that matching parts fit. Use order and crate numbers to match the records to your shipment. Agree on any changes before packing.

## Key facts at a glance

- The approved drawing and purchase order define what is being inspected.
- Material appearance should be judged against the agreed sample or lot method.
- Critical dimensions include component size, thickness, holes, joints and base margins.
- Finish inspection needs neutral light and views that reveal polish, edges and repairs.
- Complex sets may need dry assembly or fit checks before packing.
- Final evidence should connect each item and crate to the order and packing list.

![Black granite companion monument photographed in the workshop for the Rodrigues project record](https://www.cnmonuments.com/images/case-studies/us-black-granite-monument-2024/workshop-upright.jpg)

Workshop photograph from the [Rodrigues project record](https://www.cnmonuments.com/case-studies/us-black-granite-monument-2024/); it illustrates a finished component, not a calibrated inspection or independent certification.

Before shipping, check the stone, sizes, finish, lettering, fit and packing against what you approved. Ask for clear photos and the measurements that matter for your designs, marked with the item or order number. Resolve any differences before the pieces are packed and released.

## What should you check before shipment?

If a shipment arrives damaged, preserve the packaging and transport records, photograph the condition before moving it when safe, and follow the carrier, broker and insurer claim procedure. A final photograph alone is not a substitute for agreed inspection photos and measurements.

## Agree on quality checks before production

Before production, gather the latest drawing, product list, [stone sample](https://www.cnmonuments.com/granite-materials/), finish details, artwork and packing instructions in one place. Include any cemetery size limits. Mark the drawing version and agree who can approve changes.

Not every dimension needs the same tolerance or evidence. Identify the features that affect cemetery acceptance, assembly, appearance or installation and require those checks explicitly. The factory can then plan inspections around the risks of the actual product.

## Write an inspection scope for the actual order

For a remote order from a Chinese monument manufacturer, the useful question is which evidence will let your team release these particular pieces. Agree the scope before cutting, with a named contact on each side. A standard upright and a multi-piece kerb set can need different measurements, assembly checks and photographs.

Use this blank structure to request an inspection plan; it does not report an inspection already performed.

| Scope field | What the buyer and factory should agree |
| --- | --- |
| Controlled reference | Order, model, component list, units, drawing revision/date, finish schedule and artwork proof |
| Material approval | Commercial stone name, origin-information status, sample/current-lot reference and appearance method |
| Check and acceptance | Drawing callouts, agreed tolerances or appearance criteria, measurement method and any applicable test report |
| Coverage and timing | Which items are checked, at which stage, whether sampling or every-item review is required, and who records the result |
| Evidence and decision | Identified photographs or records, buyer decision maker, response needed and release condition |

Keep material appearance approval separate from dimensional, lettering and fit approval. A colour sample cannot prove an assembled set fits, and an assembly photograph does not prove a material performance requirement. For [upright monuments](https://www.cnmonuments.com/wholesale-monuments/north-american-style/upright-headstones/), mark the critical die/base interfaces; for [kerb sets](https://www.cnmonuments.com/wholesale-monuments/european-style/kerb-sets/), identify each component and its assembly position.

## Tie a deviation to the revision being released

If a difference is found, record the order/component, the approved requirement and revision, the measured or observed condition, photographs, proposed action and responsible approver. Agree whether the affected item needs further evidence, rework, replacement or written acceptance before the next step.

A drawing or inscription change should also identify the old and new revisions, affected components and their production status. Confirm any cost or timing effect and which checks must be repeated. Keep the accepted decision with the order and tell the relevant production and packing contacts which version applies. Ask the supplier to confirm the hold and release arrangements for your order; this checklist does not establish a universal factory procedure.

Before shipment, the record should connect the accepted component and revision to its crate and packing-list line. Receiving staff can then distinguish a manufacturing question from a missing-part or transport issue. See the [export packing and receiving checklist](https://www.cnmonuments.com/buyer-guides/export-packaging-for-granite-monuments/).

### Historical project-management perspective

Cristine Bouwkamp of Superior Monument, Muskegon, Michigan, described written decisions, timeline coordination and communication when assumptions changed in “A Case Study in Project Management,” *MBNews*, March 2022, printed pp. 13–15. [Find the issue in the publisher's archive](https://monumentbuilders.org/mbnews-archive/); access may require membership. The inspection record and revision questions above are our buyer recommendations drawn from that management principle. The case concerns one U.S. mausoleum project; it is not a current QC standard or evidence that Boda Stone completed these checks on your order.

## Six checks for your monument order

### 1. Check the order and latest drawing

Confirm that production uses the approved revision and that the component list matches the purchase order. Check units, finished sizes, profiles, finish symbols, holes, dowels, panel positions, accessories and customer marks. Superseded drawings should be removed from the working file.

### 2. Granite and raw material approval

Check the granite identity used on the order, the agreed origin where relevant, color range, veining, mineral marks, cracks, fills and visible natural features. Use the retained sample or lot photographs defined by the purchase order. Do not judge a polished black stone from one compressed phone image.

### 3. Cutting, geometry and joints

Measure overall and component dimensions, thickness, base margins, top profile, squareness, flatness where required, hole locations and mating surfaces. Complex monument sets should be checked as components and as an assembly. Record measurements against the drawing reference.

### 4. Surface finish and edge workmanship

Inspect polished, honed, steeled, sawn, sandblasted and rock-pitched areas according to the finish map. Look for inconsistent gloss, scratches, chips, bruised edges, tool marks, visible repairs and contamination. Use broad and raking light because different defects appear under different angles.

### 5. Decoration, fit and completeness

Compare carving, etching, panel shape, accessory recesses, agreed fixing holes and vase positions with the approved artwork and drawing. Confirm that all components are present and correctly paired. Where the set has close-fitting joints or multiple tiers, perform an agreed fit or dry-assembly check.

### 6. Final identification and packing

Before crating, reconcile quantity, marks, component pairs and the packing list. Photograph the finished item, protective separation, edge protection, internal restraint, closed crate mark and loading position as required. The evidence should let the importer trace a received crate back to the approved item.

## Photos and measurements you can ask for

| Checkpoint | Useful evidence | Buyer decision |
| --- | --- | --- |
| Material | Lot or slab images beside order identification and approved reference | Accept, request another selection or clarify variation |
| Dimensions | Measurement photographs or inspection record tied to drawing callouts | Accept or require correction before finishing |
| Finish | Neutral-light overview plus close views of faces and edges | Accept, rework or document a permissible natural feature |
| Assembly | Component layout, joint views or dry-assembly photographs | Confirm fit and completeness |
| Packing | Open-crate, closed-crate, label and loading photographs | Release packing or correct protection and marks |

## Sort out any differences before shipping

If the inspection finds a difference, describe it with the item number, drawing callout, measured condition and clear photographs. The supplier should propose rework, replacement or documented acceptance. Verbal approval in a chat thread is easy to lose; keep the final decision with the order record.

A useful quality system does not hide every natural stone characteristic. It distinguishes approved natural variation from a defect, and it gives both parties a repeatable method to decide.

## Your final checks before shipment

- Correct drawing revision and purchase-order quantity.
- Approved granite identity and appearance range.
- Critical dimensions and interfaces recorded.
- Visible finishes, edges and decoration checked.
- Components paired and fit confirmed where required.
- Deviation decisions closed in writing.
- Packing evidence and crate marks reconciled to the packing list.

For the factory-side sequence used by Boda Stone, see our [quality control process](https://www.cnmonuments.com/how-we-work/quality-control/). Importers can use the checklist on this page to define their own order-specific acceptance plan.

## Send your inspection requirements

For a trade order sourced from China, send your company, destination and product schedule with the inspection scope. Tell us whether you already import or are considering direct purchase, who approves the evidence and which checks remain open.

- Buyer role, destination country and port, product models, approved drawing revision, and critical dimensions or tolerances.
- Stone, current-batch or sample reference, finish, lettering/artwork, component fit, and acceptable repair or rejection criteria.
- Inspection timing, photo/video records, pre-shipment approval, crate marks, packing evidence, and the documents needed for a damage claim.

[Send inspection requirements](https://www.cnmonuments.com/buyer-guides/monument-inquiry-pack/?topic=inspection#inquiry-form)

## References and editorial update

- [USDA APHIS — Wood Packaging Material](https://www.aphis.usda.gov/plant-imports/wood-packaging-material): official U.S. requirements relevant to regulated solid wood packaging.
- [Natural Stone Institute — Testing Services](https://www.naturalstoneinstitute.org/resources/natural-stone-testing-services/): material testing is separate from a visual finish check.
- [Boda Stone — Rodrigues project record](https://www.cnmonuments.com/case-studies/us-black-granite-monument-2024/): company-supplied workshop and project evidence, not independent certification.

*By the Boda Stone Technical Team. First published July 29, 2026; editorial update November 20, 2026. The blank form is a planning aid, not a completed inspection report. Verify current destination, carrier and cemetery requirements for each order.*

Published by: [Boda Stone](https://www.cnmonuments.com/) · [Contact](https://www.cnmonuments.com/contact-us/)

### Planning a monument order?

Send a drawing or product photo, sizes, granite, quantities and destination port. We can then discuss the details and prepare your quote.

 [Request a Quote](https://www.cnmonuments.com/contact-us/)

\#Quality Control\#Monument Inspection\#Buyer Checklist\#Stone Finish

## Frequently Asked Questions

### When should monument quality control start?

It starts before cutting, when the buyer and factory control the purchase order, drawing, material approval, finishes, decoration and packing criteria. Later inspections should refer back to that file.

### What dimensions should a buyer inspect?

Check the dimensions that affect cemetery approval, assembly and installation: overall size, component thickness, base margins, joint surfaces, holes, dowels, vase positions and special profile callouts.

### Can final photos replace an inspection report?

Final photos are useful but may not show earlier material selection, hidden joints or accurate dimensions. Combine photographs with agreed measurements, component checks and order identification.

### How should black granite polish be checked remotely?

Request clean surfaces photographed under neutral, broad light and raking light, with overview and close views. Compare consistency to the approved finish rather than relying on one highly reflective image.

### What happens when a monument is outside the approved specification?

The supplier should document the item, requirement and actual condition, then propose rework, replacement or buyer-approved acceptance. Close the decision in writing before packing.

### Should packing be part of quality control?

Yes. Correct pairing, non-abrasive separation, edge protection, restraint, crate marks, packing-list accuracy and loading evidence affect whether an approved monument arrives usable.

### What evidence should a buyer keep if a delivered monument is damaged?

Keep the crate and packaging, photograph external damage before moving the item when safe, record the crate and component codes, compare the packing list, and notify the carrier, broker, supplier and insurer under the agreed claim procedure. Acceptance or rework should be documented against the approved drawing.

## Related Articles

Related Guide 

### Boda Stone Quality Control Process

Read guide

[Boda Stone Quality Control Process](https://www.cnmonuments.com/how-we-work/quality-control/)

Related Guide 

### Monument CAD Design and Approval

Read guide

[Monument CAD Design and Approval](https://www.cnmonuments.com/how-we-work/cad-design-capabilities/)

Related Guide 

### Packing Granite Monuments: What Buyers Should Check

Read guide

[Packing Granite Monuments: What Buyers Should Check](https://www.cnmonuments.com/buyer-guides/export-packaging-for-granite-monuments/)

## Other language versions

- [Čeština (cs)](https://www.cnmonuments.com/cs/oborove-postrehy/clanky/kontrolni-seznam-6-bodove-kontroly-kvality-pro-velkoobchodni-zulove-pamatky-boda-stone/index.md)
- [Deutsch (de)](https://www.cnmonuments.com/de/brancheneinblicke/ratgeber/die-6-punkte-checkliste-fur-die-qualitatskontrolle-fur-grohandelsgranitdenkmaler-boda-stone/index.md)
- [Español (es)](https://www.cnmonuments.com/es/perspectivas-industria/articulos/lista-de-control-de-calidad-de-6-puntos-para-monumentos-mayoristas-boda-stone/index.md)
- [Eesti (et)](https://www.cnmonuments.com/et/toeala-ulevaated/artiklid/6-punktiline-kvaliteedikontrolli-nimekiri-hulgi-graniitmalestiste-jaoks-boda-stone/index.md)
- [Français (fr)](https://www.cnmonuments.com/fr/actualites-secteur-funeraire/articles/liste-de-controle-de-la-qualite-en-6-points-pour-les-monuments-en-granit-de-gros-boda-stone/index.md)
- [Magyar (hu)](https://www.cnmonuments.com/hu/iparagi-betekintes/cikkek/a-6-point-minosegellenorzesi-ellenorzo-lista-a-nagykereskedoi-granit-muemlekekhez-boda-stone/index.md)
- [Italiano (it)](https://www.cnmonuments.com/it/approfondimenti-settore/articoli/la-lista-di-controllo-di-qualita-a-6-punti-per-i-monumenti-della-granita-all-ingrosso-boda-s/index.md)
- [Nederlands (nl)](https://www.cnmonuments.com/nl/branche-inzichten/artikelen/de-6-puntscontrole-voor-granieten-grafmonumenten-in-de-groothandel-boda-stone/index.md)
- [Polski (pl)](https://www.cnmonuments.com/pl/wiedza-branzowa/artykuly/6-punktowa-kontrola-jakosci-dla-hurtowych-granitowych-zabytkow-boda-stone/index.md)
- [Português (pt)](https://www.cnmonuments.com/pt/perspectivas-setor/artigos/a-lista-de-controle-de-qualidade-de-6-pontos-para-monumentos-de-granito-por-atacado-boda-sto/index.md)
- [Română (ro)](https://www.cnmonuments.com/ro/perspective-industrie/articole/lista-de-control-al-calitatii-6-puncte-pentru-monumentele-cu-ridicata-de-granit-boda-stone/index.md)
- [Русский (ru)](https://www.cnmonuments.com/ru/resursy/stati/kontrol-kachestva-granitnyh-pamyatnikov/index.md)
- [Slovenčina (sk)](https://www.cnmonuments.com/sk/odborove-postrehy/clanky/kontrolny-zoznam-6-bodovej-kvality-pre-velkoobchodne-pamiatky-boda-stone/index.md)

---

Canonical HTML source: https://www.cnmonuments.com/buyer-guides/granite-monument-quality-control/
