BODA STONE — MONUMENT DRAWING APPROVAL CHECKLIST Original buyer worksheet | Prepared 2026-11-11 Order-specific guidance; acceptance terms require agreement. Order/project ID: Buyer / factory approval contacts: Model/component IDs and quantities: Controlling drawing filename and revision: Superseded revision withdrawn: Units and controlling dimensions: Reference edges / centre lines: Critical interfaces and inspection method: Agreed acceptance limits: Material name / agreed origin / current lot or sample reference: Finish by face: Inscription and artwork proof revision / written approval: Future inscription space / retained artwork: Artwork permissions and permitted production use: Local cemetery requirements and approval reference: Open questions / affected work on hold: Change description / impact on scope, cost and timing: Release approved by / date: Inspection record and crate-mark references: Guide: https://www.cnmonuments.com/industry-insights/monument-drawing-approval-and-change-control/ Enquiry: https://www.cnmonuments.com/buyer-guides/monument-inquiry-pack/