Germany · May–June 2024 · Project Case Study

German Cremation Memorial Project: Component Coding and Factory Trial Assembly

This project involved one 13-piece, two-colour cremation memorial from a four-container mixed order. Production was completed in May 2024 and shipment was released in June 2024. The record follows the component schedule, interface checks, full-size dry fit and same-set packing release.

Project at a glance

The customer name is withheld. The four-container figure describes the complete German mixed order; the featured model is one memorial set within that order.

MarketGermany
Production monthMay 2024
Shipment monthJune 2024
Complete order scale4 × 20GP mixed containers
Product typePerimeter-border cremation memorial with twin upright steles
MaterialsFine-grain black granite and beige veined natural stone
Overall finished size1800 × 1100 × 1050 mm (L × W × H)
Components13 coded stone components per set
Per-set packing data450 kg stone net weight; 540 kg packed gross weight; 0.9 m³ packed volume
Component codesA1–G1, with same-set numbered wooden-crate packing
Project record: Customer name withheld for privacy. The dimensions, quantities and packing details below apply to this project.

Project materials

Customer requirement

The German customer placed a four-container mixed order covering several cremation memorial designs. This model combines a perimeter border, two upright steles, a shaped rear pedestal, three front-border sections, rear connecting components, inner support rails and an accessory mounting component.

Because the memorial had to be disassembled for international transportation, each component had to be clearly identified and the complete memorial had to be dry-fitted in the factory before packing.

Actual challenge

The memorial contained mirrored components and several parts with similar shapes, while their installation positions and directions were different. The production team had to prevent cross-set mixing, maintain a continuous curve along the perimeter border, keep the black-and-beige interfaces level and flush, position both upright steles accurately, confirm the footprint and diagonals, and check the level, verticality and stability of the complete assembly.

How we handled it

Each memorial set received an order code, and each individual component received a unique identification code from A1 to G1. Before packing, the complete memorial was laid out at full size on the factory floor and assembled without permanent adhesive.

The inspection covered the 1800 × 1100 mm footprint, perimeter diagonals, curved-border continuity, joint width and height difference, black-and-beige flush alignment, the position and verticality of both upright steles, the contact condition of all supporting surfaces and overall stability. Small levelling blocks were used where needed. Interface edges requiring correction were fine-ground, followed by a second assembly and reinspection.

After the complete memorial passed inspection, the dry fit was photographed and recorded. Components were disassembled in sequence, cleaned, protected and moved into same-set numbered wooden crates.

Component schedule

CodeComponentFinished size / interfaceQty.
A1Black upright stele250 × 850 × 120 mm1 pc
A2Beige upright stele250 × 850 × 120 mm1 pc
B1Rear shaped pedestal900 × 350 × 100 mm1 pc
C1–C2Left and right side borders1750 × 120 × 120 mm each2 pcs
D1–D3Front border — left, centre beige and right400 / 300 / 400 × 120 × 120 mm3 pcs
E1–E2Rear connecting componentsProfile-machined to approved drawing2 pcs
F1–F2Inner support rails1200 × 70 × 60 mm each2 pcs
G1Accessory mounting componentØ100 mm mounting hole1 pc
Total13 pcs

Completed result

The complete factory dry fit passed inspection. The 13 coded stone components matched within the same memorial set, the black-and-beige interfaces were level and flush, the perimeter border formed a continuous line, both upright steles were correctly positioned and vertical, and the supporting surfaces were stable and evenly seated.

All components were released for same-set wooden-crate packing. The wider workshop photograph records 15 complete or near-complete cremation memorial groups from the same German order at different production and trial-assembly stages.

Evidence recorded for this project

  • Customer reference photograph and factory workshop photograph.
  • Component identification and finished-dimension schedule for A1–G1.
  • Full-size dry-fit checks for footprint, diagonals, curved-border continuity, interfaces, verticality and support contact.
  • Same-set wooden-crate packing record with component codes and packing list.
  • Production completed in May 2024 and shipment released in June 2024.